Client:

Catalyst Capital LLP

 

Contract Administrator:

King Sturge LLP

 

Value:

£500,000

 

Project Description:

1st floor office refurbishment

  • 200_Grays_Inn1_1
  • 200_Grays_Inn1_2
  • 200_Grays_Inn1_3

The refurbishment of this 2000m² office space was completed within 8 weeks, 2 of which were during the Christmas shut down period.

Existing ceilings, partitions and electrical / data services and some air conditioning services were stripped out.

New VAV units were added to the existing installation to ensure the floor was converted back to the original base build installation.

Burgess metal ceiling tiles were installed incorporating LG3 2001 compliant light fittings.

Two new distribution boards were installed along with under floor power.

We replaced in excess of 500m² of computer floor pans and subsequently laid new carpet and re-decorated the entire area.